File

ibwt-under-construction-origin_fixed.nc

ISIMIP3b InputData socioeconomic 20260205

Cite as

Saritha Padiyedath Gopalan, Naota Hanasaki, Lisa Novak, Jacob Schewe (2026): ISIMIP3b Inter Basin Water Transfer (v1.0). ISIMIP Repository. https://doi.org/10.48364/ISIMIP.821399

Properties

  • Path
    ISIMIP3b/InputData/socioeconomic/inter_basin_water_transfer/ibwt-under-construction-origin_fixed.nc
  • ISIMIP ID
    502efac8-72fc-40bf-ace8-7bc02ada18dc
    Size
    26.9 KB
    Checksum (sha512)
    0405f0381d8e9be7366643b907b99d37069d44625e196faabea6ac2e99624c60445543ff2b708478e864ae480055fa38ee110cae1986c9063940da86b8375bfd
    Version
    20260205

Specifiers

Simulation round
ISIMIP3b
Data product
Input Data
Input category
Direct human forcing
Input subcategory
Inter basin water transfer
Direct human forcing dataset
Inter basin water transfer
Time step
fixed

Rights

When using ISIMIP data for your research, please appropriately credit the data providers, e.g. either by citing the DOI for the dataset, or by appropriate acknowledgment. We strongly encourage to offer co-authorship to at least a representative of the data providers. Further information can be found in our terms of use.

Download

Part of the dataset

All versions of this file