File
ibwt-under-construction-destination _fixed.nc
ISIMIP3b
InputData
socioeconomic
20260205
Cite as
Saritha Padiyedath Gopalan, Naota Hanasaki, Lisa Novak, Jacob Schewe (2026): ISIMIP3b Inter Basin Water Transfer (v1.0). ISIMIP Repository. https://doi.org/10.48364/ISIMIP.821399
Properties
-
Path
ISIMIP3b/InputData/socioeconomic/inter_basin_water_transfer/ibwt-under-construction-destination_fixed.nc -
- ISIMIP ID
6adcb4e7-a594-4d4d-80ca-a32bf5c65b8c- Size
- 28.9 KB
- Checksum (sha512)
- ffa94ed1c6d3a9f08e8b20b0c57e1df7c4f369c7fc28958c7fee1c5f86948d95f9690a67610cbd3b260b24ba878627484d4f5e317fc1c4609a017d277f4cb0c0
- Version
- 20260205
Specifiers
- Simulation round
-
ISIMIP3b
- Data product
-
Input Data
- Input category
-
Direct human forcing
- Input subcategory
-
Inter basin water transfer
- Direct human forcing dataset
-
Inter basin water transfer
- Time step
-
fixed
Rights
When using ISIMIP data for your research, please appropriately credit the data providers, e.g. either by citing the DOI for the dataset, or by appropriate acknowledgment. We strongly encourage to offer co-authorship to at least a representative of the data providers. Further information can be found in our terms of use.
Download
Part of the dataset
-
ISIMIP3b InputData socioeconomic 20260205
All versions of this file
-
ISIMIP3b InputData socioeconomic 20260205